NEC Section 705.12 and Utility Interconnections | SolarPro Magazine
Beyond 705.12(A), the NEC does not provide rules for the methods required to make supply-side connections. Consequently, PV system integrators have had to improvise and work with their inspectors to install systems that everyone thinks are safe. In most c...